Bog fixed on Duck Down

9.12.15  Bruce and Jane McCallum and Alan Eskrick were up working on Duck Down today fixing one of the boggy sections. They scoured the area for rocks to drop in to the bog, then overlaid jakmat, which was then covered with barrow loads of clay. More jackmat is needed to completely finish the section but there is enough rock in now to make it rideable. There is one more major bog to fix, which they hope to attack in the next week or two and then cast their attention on some of the smaller muddy sections of the track that have developed over the last winter.

Bruce drops rocks into the seemingly bottomless bog

The completed piece of track